WEDNESDAY, July 17

Recently Opened

  • Sweater Vest. Repairs to berms completed. 
  • Bad Habit. Corners rebuilt, jumps reworked, and a rest area constructed. Two side-by-side images of a mountain bike flow trail recently worked on.

Recent Maintenance 

  • No Quarters. Changes made to on-off feature landing. The view from the top of a wooden drop on to a mountain bike flow trail.
  • Super Nugget. Plywood removed. A mountain bike flow trail with a square where plywood was recently removed.
  • Steam Shovel Upper. Plywood removed. 
  • Easy Wind. Vegetation trimmed.A mountain bike trail with lush vegetation recently trimmed back.
  • High Octane. Vegetation trimmed.A mountain bike trail with lush vegetation recently trimmed back.

Coming Soon

  • Pinball Wizard. Small section of the trail is being rebuilt to open soon. A recently constructed mountain bike trail berm with the bucket of an excavator in the left corner.
  • Dr. Feelgood. Construction continues on this new XC trail. The excavator is working on the last 600m of trail while the Trail Crew focusses on clearing the existing trail and constructing bridges.

Notes From Trail Crew

The warm weather has continued, drying up most of the existing wet patches, and removing the need for plywood. While we're starting to see a bit of dust on the trails in the sun, you can still find great tacky dirt in the trees. Please note that the Ski Cross Course construction is temporarily affecting lower Arm Pump and lower Super Nugget. The crew is working to have these runs open with alternative outruns soon. 

Previous Dirt Reports

July 10, 2024

Recently Opened

  • Sweet One. Major water damage repaired and corners buffed.  Two side-by-side images of a mountain bike trail recently repaired.
  • Sugar. Corners rebuilt, water damage repaired, bridge reconstructed, and surgical table repaired. Two side-by-side images of a before and after of a wooden feature on a mountain bike trail being fixed. Recently constructed bridge over a river in a forest.
  • No Quarters. Construction completed. A recently constructed mountain bike trail with wooden features.
  • Progression Park Jump Zone. Mulch jump construction completed.  A recently constructed mountain bike jump with a mulch-covered landing.

Coming Soon

  • Sweater Vest. Currently being repaired to open soon. 
  • Bad Habit. Top to bottom repairs continue with the excavator to rebuild corners and jumps for improved flow. Two side-by-side images of recently repaired mountain bike trail berms.

Notes From Trail Crew

This was a great week for Trail Crew with the warmer weather allowing us to make significant progress on the remaining water damage from the spring melt. Beat the heat at altitude and come enjoy the trails while the dirt is prime. 

July 3, 2024

Recently Opened

  • Sticky One. Trail damage repaired. 
  • Honey Drop. Water damage fixed and trail buffed. Now open from 4 Road down.Two side-by-side videos of a mountain bike trail recently buffed.
  • Insanity One. Trail buffed, water damage repaired, and bridge constructed at the traverse. A newly constructed bridge over mud at the end of a mountain bike trail.

Coming Soon

  • Sugar. Currently being worked on to open very soon. 
  • Sweet One. Currently being worked on to open soon.
  • Sweater Vest. Will be the next trail to be repaired following drier conditions. 
  • Bad Habit. Requires machine work to repair the trail from the winter.
  • No Quarters. The crew continues to work on shaping the trail. Drier conditions will allow the crew to finish the build. Two mountain bike trails curve side-by-side with wooden wall rides.

Notes From Trail Crew

The Trail Crew has been busy repairing holes and ruts from the recent rain, weed whacking all ski run crossings after a lush spring, and preparing the remaining closed tech and Progression Park trails to open. We hope that everyone's been enjoying the tacky dirt post rainfall. 

JUNE 26, 2024

Recently Opened

  • Barn Burner. Snow removed, berms fixed, and trail buffed. Two side-by-side images of a bike trail. The right photo has snow shoveled out on either side with a trail builder in the middle.
  • Mach. Trail buffed and berms fixed. Two side-by-side photos of a mountain bike trail recently worked on.
  • Upper Bermalade. Brake bumps fixed and trail buffed. Two side-by-side photos of berms on a mountain bike trail recently worked on.
  • Upper Canada Line. Snow removed and trail buffed.
  • Two Bits. Trail construction completed. New features opened. Two side-by-side photos of wooden features built in the Progression Park.

Coming Soon

  • Insanity One. Currently being worked on to open soon. 
  • Honey Drop. Ruts filled and berms reshaped. Currently being reworked to open soon.Two side-by-side photos of a steep mountain bike trail recently maintained.
  • Gummy Bear. Currently being worked on to open soon.

Notes From Trail Crew

The mud has been drying up after the rain last week, so we're experiencing some all time hero dirt right now. Canada Line, Stella Blue, Might As Well, and Bermalade are all open top to bottom. We anticipate being able to open more tech trails this weekend. Enjoy the long weekend laps!

JUNE 19, 2024

Recent Maintenance

  • Spicy Taco. Braking bumps fixed.Berm on bike trail recently smoothed.
  • Smitty's Steeps. Bottom line cleaned. Side-by-side comparison of a bike trail raked.
  • Super Nugget. Drainage fixed. Water damage repaired.  Side-by-side comparison of a bike trail's water damage fixed.Water damage to bike trail.
  • Sunburst. Snow removal continues at the top of Sunburst to speed up the opening of more trails from the Sunburst Express to 4 Road. Snow removed from the start of a bike trail.

Coming Soon

  • Progression Park. Construction of new trails No Quarters and Two Bits was paused due to wet conditions but has resumed with the warmer weather. Stay tuned on our social media for more information about their upcoming opening.

Notes From Trail Crew

We were stoked to see everyone out, enjoying the trails over Opening Weekend. Unfortunately, Mother Nature has continued to test Trail Crew with persistent rain and snow across the Bike Park. The wet conditions forced us to divert efforts from opening additional trails to repairing the water and rider damage on the trails currently open. With sunny skies and warm weather in the forecast, we look forward to making progress with the lingering snowpack at the top of Sunburst and the new construction in the Progression Park. 

JUNE 12, 2024

Recent Maintenance

  • Upper Super Nugget. Repairs to trail and jumps.Two photos of mountain bike trail jumps side by side.
  • Lower Super Nugget. Drainage fixed and bridge constructed to stop further water damage.  Recently constructed bridge on a mountain bike trail.
  • Arm Pump. Rock garden rebuilt. A rocky chicane on a bike trail, viewed from above.
  • Spicy Taco. Trail raked, rocks removed, and braking bumps fixed. Four trail builders use shovels and rakes to repair trail.One trail builder removes rocks from berm using a tool.
  • Progression Park. Berms raked and trails repaired. New trail, Gravity Ghosts, constructed.Side-by-side comparison of a berm before and after being shaped.
  • Pump Track. New design built and shaped. Open as of Monday, June 10.Three trail builders cut a red ribbon to open the pump track.

Coming Soon

  • Progression Park. Construction of wooden jumps, drops, wall rides, and log features continues on two new trails: No Quarters and Two Bits. Trail crew milled launch logs, excavated trails, and tested features.Two trail builders cut a log with a chain saw to build a log launch.

Notes From Trail Crew

This season has seen slower spring melt and minimal stretches of warm weather so far, resulting in prolonged wet conditions throughout the Bike Park. Despite the remaining snowpack at higher elevations, the crew has been working hard and we will have a good selection of trails available for Opening Day. Our focus has been on opening trails in good shape and aiming for quality over quantity, to provide the best experience for riders. We are monitoring trail conditions closely every day and will open additional trails as soon as possible. We ask guests to respect trail closures and please be mindful that there will be plywood sheets used in some areas to cover wet sections. We're stoked to bring you new trails and wood features in the Progression Park. We look forward to opening these additions over the next few weekends. Stay tuned on our social media for a complete list of what's opening prior to Opening Day.

Two bikers on a trail and one if hitting a jump with the sunsetting in the background

 

Bike Park Day Tickets

Buy full day tickets online, in advance and save up to 35%. There may be a limited amount of tickets available for sale each day. Multi-day tickets are consecutive.

Window ticket sales may not be available to purchase in resort. Tickets purchased on the same day of use (if available) are subject to full price rates.

Buy Now

Top